AVA Bridge Stowmarket
AVA Bridge Stowmarket Read More »
Bank Station is one of the many busy stations in London which serves 5 lines including the DLR. In the last few years it has undergone major capacity upgrade works to improve over crowding, interchange times, and provide a more direct step-free access to the different transport lines. McNealy Brown were contracted to design, fabricate
McNealy Brown were contracted to remove some of the existing steelwork and conduct repair and strengthening works at Ryde Pier. Our works included repairs to the super structure, weather screen, rail bearers, GRP walkway and upstand. Our works are expected to extend the lifespan of the pier by up to 60 years. All the steelwork
Ryde Pier – Isle of Wight Read More »
Hackney Central Station has undergone some great upgrades to reduce station congestion funded through Network Rail’s Accelerated Enhancement Fund. These improvements include two new staircases featuring LED handrails and two maintenance platforms. McNealy Brown were contracted to design, fabricate, apply surface finishes and install these works. A single width staircase was installed to Platform 2
Hackney Central Station Read More »
McNealy Brown have been working on the Bond Street Station project since 2017 alongside Costain Skanska JV. Our package involved the design, fabrication and installation of several front and back of house items including: Supporting Steel Work Frames Service Risers Balustrades Handrails Elevator Trims Non-public Platform Security Fencing Platform End Cages Lifting Beams to several
Bond Street Station Read More »
McNealy Brown assisted with the design, fabrication and installation of some of the key metalwork items for the project. The package included the fabrication and installation of: Glazed Balustrades Platform Barriers and Gates Glazed Screens Gantries Ladders Handrails and Railings Open Mesh Steel Flooring Structural Support Steel Work McNealy Brown were responsible for progressing the
Northern Line Extension Read More »
McNealy Brown were provisionally engaged to assist with the design development (ECI). Following design approval McNealy Brown completed the fabrication and installation of the strengthening repair works to the structural members, which date back to 1847. The strengthening works included: Cross Girder Bottom Flange Plates Cross Girder Web Plates RSA Cranked Angle Stiffeners Fabricated Main
Landport Spans 7 to 17 Read More »
McNealy Brown were initially engaged to assist with the design phase of the Demark Hill scheme. We were successfully employed to carry out the supply and installation for New steel canopies and cladding with PV solar panels incorporated in them to Platforms 2 & 3 and 4. As part of Network Rails scheme, and design
Denmark Hill Phase 1 Read More »
McNealy Brown were approached to assist in the design development of a Station Canopy system which could be assembled close to site and craned into position during a single possession. As part of GTRs Station improvement programme, McNealy Brown were employed to supply and install the new canopy to platforms 2 and 3 at Tulse
Tulse Hill Canopy Read More »
McNealy Brown assisted with RIBA stage 3-4 of the design development. Our in-house 3D detailers worked alongside the clients design team to evolve the final design. Our works on the scheme included: Columns Walkway Bridge and Glazing Cycle Bridge and Glazing Staircase Ramp Sections North Ramp Balustrades and Handrail Redirock Wall Blunt Top Fencing Platform
Feltham Station Upgrade Read More »
As part of TFL’s plans for additional passenger capacity, including new and longer trains, Ealing Depot needed to be redeveloped and modernised to enable the housing and maintenance of the latest rolling stock. The depot consists of three sheds (EC1, EC2 and EC3). In EC2 McNealy Brown were required to install 4 low level platforms
Ealing Common Depot Read More »
McNealy Brown were contracted to design, fabricate and install Access For All works spanning four platforms at Virginia Water Station. The works included: Handrails CAT Ladders Structural Steelwork Link Bridges / Lobbies All fabrications were carried out at our Sittingbourne workshop, followed by a trial setting out of the link bridges and link lobbies. Handrails
Virginia Water Station Read More »