McNealy Brown were contracted to remove some of the existing steelwork and conduct repair and strengthening works at Ryde Pier. Our works included repairs to the super structure, weather screen, rail bearers, GRP walkway and upstand. Our works are expected to extend the lifespan of the pier by up to 60 years.
All the steelwork was fabricated in our workshop in Sittingbourne, Kent, and delivered to site in phases. We had a large team dedicated to this project, primarily in site operatives as the pier spans 620m in length and required the installation of 110t of steelwork.
Health and safety was top priority due to the works being above the sea and the requirement for heavy lifting. A safety briefing was held every morning as well as regular safety checks on equipment and PPE.