Client
Podtrak

Main Contractor
GTR

Contract Value
£377,860

Project Date
August 2020

Project Datasheet

McNealy Brown were approached to assist in the design development of a Station Canopy system which could be assembled close to site and craned into position during a single possession.

As part of GTRs Station improvement programme, McNealy Brown were employed to supply and install the new canopy to platforms 2 and 3 at Tulse Hill Station. The scheme required the supply and installation of a 38m x 6m canopy to platforms 2 and 3. This included supplying cladding, a walkway and a man-safe system for safe roof access.

The canopy structure was designed by our in house draughtsman and fabricated in our workshop, complete with a galvanised finish.

McNealy Brown systematically constructed the canopy on temporary steelwork trestles. This enabled the canopy to be erected and fitted out with powder-coated zinc cladding, inclusive of new wiring & lighting. The canopy support columns were supplied ahead of the main Canopy structure to allow installation during a 36 hour possession. The main Canopy was then lifted into position on top of the support columns in six pre-clad sections.