Author name: simon

McNealy Brown support the Illuminated River scheme

Following the successful installation of phase one of the Illuminated River in late 2019 which saw the illumination of Millennium, Southwark, Cannon St and London Bridges, McNealy Brown were engaged to provide similar services on the second phase of longest public art commission in the world. McNealy Brown assisted with design and buildability prior to

McNealy Brown support the Illuminated River scheme Read More »

McNealy Brown deliver the phase 1 canopy works at Denmark Hill

McNealy Brown took possession of the highway adjacent to Denmark Hill station on 18th December 2020 and assembled the new platform canopy sections (6) for platforms 2/3 & 4 at Denmark Hill. The teams worked around the clock installing the structural steel frame and specialist roof cladding with integrated solar panelling. During a 52hrs railway

McNealy Brown deliver the phase 1 canopy works at Denmark Hill Read More »

McNealy Brown successfully complete the feature staircases at Fenchurch Street

Though it sometimes felt like the odds were stacked against us, McNealy Brown navigated through the turmoil caused by the Covid-19 Pandemic to complete 2 feature staircases, architectural panelling supports and bespoke main entrance ceiling panelling at 80 Fenchurch St. This prestigious project highlights McNealy Browns tenacity to achieve and our ability to work to

McNealy Brown successfully complete the feature staircases at Fenchurch Street Read More »

McNealy Brown successfully supply and install a new footbridge and restoration of existing footbridge at Sandwich Station

McNealy Brown were engaged to Fabricate and install a new footbridge and walkway from the station platforms at Sandwich to create a direct walking route into the Royal St Georges Golf Course, in advance of the 2020 Open Golf Championship. Unfortunately the Golf Competition could not go ahead, as a result of the Covid 19

McNealy Brown successfully supply and install a new footbridge and restoration of existing footbridge at Sandwich Station Read More »

McNealy Brown Successfully Pass 14001 and 18001 Accreditation

We are pleased to announce that, after a ‘0’ Non conformance audit by ISOQAR, McNealy Brown Ltd have successfully achieved certification to OHS18001 (Health and Safety) and ISO14001 (Environment) alongside our existing certifications to ISO9001 (Quality) and BS EN 1090 (CE Marking – fabricated products). McNealy Brown Ltd take our works seriously and our goal

McNealy Brown Successfully Pass 14001 and 18001 Accreditation Read More »