Hackney Central Station has undergone some great upgrades to reduce station congestion funded through Network Rail’s Accelerated Enhancement Fund. These improvements include two new staircases featuring LED handrails and two maintenance platforms. McNealy Brown were contracted to design, fabricate, apply surface finishes and install these works.
A single width staircase was installed to Platform 2 with the top landing meeting the existing lobby floor. The top landing also sees two glass panels for wind and rain protection to match the existing structure. The installation of Platform 2 Staircase was successfully completed in one night shift using a crane. Resin SL Deck Coat anti slip aggregate was applied on site to the lower, mid and top landings of the staircase.
Graham Road features a new double width staircase adjoining to the existing Platform 1. Along the left hand side of the staircase there is a privacy screen with a balustrade on the opposite side. Both staircase feature Polydeck stair treads fixed to welded steel treads, Polydeck floor panels and rainwater drainage. Due to the space constraint on site, Graham Road Staircase was installed using a telehandler in piecemeal sections.