Author name: Ana Ferreira

McNealy Brown are certified to BIM Verification Level 2

McNealy Brown Limited are proud to announce that we have successfully passed our BIM Stage 2 audit with no NCR’s or observations and are now certified to ISO 19650-2:2018 Verification level (incorporating the UK National Annex). This will put McNealy Brown in a good position going forward, not only on current projects, but also securing

McNealy Brown are certified to BIM Verification Level 2 Read More »

Dukes Meadow Footbridge Update – Span 2 leaves our workshop

The first section (Span 2) of the new Dukes Meadow footbridge has successfully left McNealy Brown’s workshop! Span 2 measures a total of 27 meters in length and weighs 18 tonnes. This is one of the longest steelwork structures to ever leave our workshop in Sittingbourne, Kent. Given its size, it was definitely a challenge

Dukes Meadow Footbridge Update – Span 2 leaves our workshop Read More »