Bank Station

Client
Dragados

Main Contractor
London Underground Ltd

Contract Value
£1,500,000

Project Date
February 2023

The Bank Station capacity upgrade works were completed on the 27th February 2023, where a brand new station entrance opened. These works were a necessity to reduce over crowding, improve interchange times, provide step-free access to DLR platforms, and improve connectivity between stations.

McNealy Brown were involved in this project for nearly two years, working on a bespoke architectural façade system, a main canopy as well as a few other elements of work.

Bank Station is one of the many busy stations in London which serves 5 lines including the DLR. In the last few years it has undergone major capacity upgrade works to improve over crowding, interchange times, and provide a more direct step-free access to the different transport lines.

McNealy Brown were contracted to design, fabricate and install the following:

  • A highly bespoke architectural façade system
  • Canopy spanning approx. 21.5m on the new station opening on Cannon Street
  • Bespoke Bostwick Gate
  • Drainage system

The design process of this project required a lot of input from both ourselves and the architects due to some of the complexities of the original design scope. For example, the bespoke architectural façade system included hidden fixings. This design needed to be coordinated with the other trades including stone cladding to ensure there were no clashes on site during installation. Additionally, we fabricated and installed a canopy above the ticket hall which spanned approx. 21.5m in length and 2.5m in depth. Beneath this, housed a bespoke Bostwick gate, which given the size of the new entrance at Cannon Street, is one of the largest on the London Underground Network.