Triton Square

Client
Maylim Ltd

Main Contractor
UK Power Networks

Contract Value
£374,000

Project Date
December 2022

Triton Square was a refurbishment project of an existing UPKN Sub-station. McNealy Brown fabricated and installed some structural support steelwork as well as some more detailed metalwork elements throughout the structure.

Triton Square was a refurbishment project of an existing UKPN Sub-station based on a design intent presented by Arup. Our design team was able to work off a 3D survey to develop a complete 3D model of the building to ensure its build-ability. This level of detail involved months of design meetings to finalise our items of work which included the green wall structural support, mesh wall structural support, flashings replacement, balustrades and the Corten steel picture frame elements. As our work was providing the structural support for the work of other trades, we had to work collaboratively as they had to be able to utilise our structure as a base for their install.

There were many elements of work to consider during the fabrication process, such as the processing of the Corten steel and aluminium sheets as well as the profiling and folding of stock sheets (which was completed by FCF). Given the range of work we fabricated, there were different finish processes we had to carry out also:

  • Main mild steel structure – Galvanised.
  • Corten steel picture framing elements – Setting/starting of it patternation process and sealing.
  • Aluminium louvres, flashings and mesh panels – Powder coated in house.

McNealy Brown would like to say a special thanks to FCF and our Powder Coating department, as they played a critical role in the delivery of this project.