McNealy Brown had the pleasure of working on such a prestigious project, assisting with the design, manufacture and installation.
Our design team developed a 3D Model of the footbridge, which had to pass a CAT 3 Structural Checking process, to add VE input and buildability factors. This model played a critical role ensuring there were no clashes between different trades work. The footbridge was designed to be installed in 7 main sections: 4 spans and 3 piers. Span 2, measuring 27m in length, sailed up the River Thames for 36 miles from Tilbury Docks to Chiswick. Given its length and location of the works, this was the safest and most feasible method of transportation.
The bridge features electropolished stainless steel panels, and Neatdek aluminium flooring.
Due to the complex heavy lifts involved we had to use a male/female system. This meant there was an immediate connection once the spans were lowered by crane, plugging directly into the previously installed section. The tidal flow was another crucial element that was monitored regularly as this impacted site working hours.
Another important factor that needed to be considered and monitored during installation was tidal flow.