Denmark Hill Phase 1

Client
BAM NUTTALL

Main Contractor
Network Rail

Contract Value
£637,000

Project Date
2020

Project Datasheet

McNealy Brown were initially engaged to assist with the design phase of the Demark Hill scheme. We were successfully employed to carry out the supply and installation for New steel canopies and cladding with PV solar panels incorporated in them to Platforms 2 & 3 and 4.

As part of Network Rails scheme, and design from INNVU, McNealy Brown provided early contractor Involvement to develop a design which could be constructed off site and lifted into position during a railway blockade.

Following the successful design phase McNealy Brown where employed to manufactured and installed the two new canopies on platforms 2/3 and 4 at Denmark Hill Station.

The canopies where manufactured in line with the design developed by McNealy Brown, in kit form. The unassembled components where transported to site in advance of the Rail blockade and assembled in the an adjacent Road, which was closed to traffic. Teams worked around the clock to construct the structure with Cladding works progressing directly behind, to meet the programme.

The cladding system ustilised on the scheme was Kalzip Roof sheeting with photovoltaic panels (PV). A walkway was created by implementing a GRP grated decking panels above of the gutter to provide a safe access system for maintenance.

The canopies were designed to be split into three sections. These sections where all installed over a 52Hr Blockade during the Christmas Holiday, along with all the necessary columns.