The McNealy Brown team were contracted to design, procure, manufacture, deliver and install the supporting framework for a new siphon system at Bewl Water. Our brief included:
27 no 1600 Pipe Supports (mild steel)
21 no 1700 Pipe Supports (stainless steel)
3 no 1700 Pipe Supports without top strap (stainless steel)
The supports were designed for a series of three 30m-long (98.4 ft), 1.7m-wide (5.8ft) pipes, which serve as the new drainage system at Bewl Water, to ensure the reservoir has both more resilience and the required assurance of safety. When needed, surplus water will be channelled into the River Bewl, from where it will then eventually flow into the River Medway.
The primary chamber at Bewl Water is now drained by these three large siphons, which speeds up the rate of drainage from the old level of 15cm in 5 days to the new rate of 5m in 5 days.
This new spillway will allow Southeast Water to drain the equivalent of an Olympic swimming pool every minute from the dam, which will ensure both Bewl Water, the land around it and settlements nearby are future-proofed against climate change – for many years to come.
See the full story: