Dukes Meadow Footbridge Update – Span 2 leaves our workshop

The first section (Span 2) of the new Dukes Meadow footbridge has successfully left McNealy Brown’s workshop!

Span 2 measures a total of 27 meters in length and weighs 18 tonnes. This is one of the longest steelwork structures to ever leave our workshop in Sittingbourne, Kent. Given its size, it was definitely a challenge getting it out of our yard. 

This was delivered to Beevers Limited where it had it’s surface finishes applied and will be finished with aluminium decking and stainless balustrade before being delivered to site for installation. It is great to see the project progressing nicely. It will definitely look impressive once complete. #McNealyBrown #DukesMeadow #KnightsBrown #Swains

Like this article?

Share on Facebook
Share on Twitter
Share on Linkdin
Share on Pinterest