McNealy Brown assisted with the design, fabrication and installation of some of the key metalwork items for the project. The package included the fabrication and installation of:
- Glazed Balustrades
- Platform Barriers and Gates
- Glazed Screens
- Gantries
- Ladders
- Handrails and Railings
- Open Mesh Steel Flooring
- Structural Support Steel Work
McNealy Brown were responsible for progressing the design from RIBA Stage 4 to RIBA stage 5 whilst upholding the clients original design intent. Likewise, some items were made from scratch by our design team as they were left out of the original design intent.
Many of the installations were challenging so there was careful planning and preparation involved between ourselves and FLO to ensure it was done safely and on time. The two new Tube Stations opened for the public September 2021. Battersea Power Station and Nine Elms are the first major Tube extensions of the century. This upgrade will support thousands of jobs and homes and improve transportation links to South London.